LumberJocks

Entertainment Center #3: Somewhat assembled and usable...

  • Advertise with us
Blog entry by woodsyguy81 posted 04-22-2013 04:03 PM 582 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 2: Building the cases Part 3 of Entertainment Center series no next part

So it’s been awhile since I’ve posted any progress on the project – I figured I’d give a quick update. I prestained everything prior to face frame assembly to make it easier on myself, although three coats of stain on every piece makes for a loooong process! I assembled everything and, thanks to my brother-in-law and his heated shop space, I was able to get it all varnished during the colder months of October and November. My wife wanted the cabinets installed before my daughter’s baptism in December, which I managed to do (with a few late nights). So, since that time, the project has been at a standstill – there’s been other smaller projects in the meantime including a Pottery Barn-style kitchen set for my daughter for Christmas and some small built-in shelving units for the bathroom (in progress). So now that the weather is warmer and the camper is out of the garage, I now have my shop space back again to finish the rest up.

On tap for the rest of the work:

- four large doors (bottom)
- six small glass doors (top and center)
- four shelves
- seven full extension drawers with false fronts (maybe, I have multiple dovetail jigs at my disposal lately!!)
- trim (crown, base, front)

Seems like it’s just as much work now as I’ve done before with the cases and face

frames!!

-- Loving the outdoors since 1981!



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com