10-29-2013 02:30 AM

My other hobby - 3 replies

!https://s3.amazonaws.com/vs-lumberjocks.com/mves48g.jpg! Trapping, but not enough time to get out very often.

10-24-2013 04:14 AM

Drywall 2 - 6 replies

Well yesterday the drywall was delivered, today the three man crew showed up and all the boarding was done in ten hours. Tomorrow the tapers show up, going to have to build a pile of stuff to pay for all this.

10-23-2013 02:10 AM

Drywall - 4 replies

Well finally after my week off work landscaping, insulation, vapor barrier, and tuck taping fully finished. The drywall arrived this morning and they will start boarding tomorrow. Its getting a little cool up here now for taping and finishing so I have energized two 30 amp circuits so they can wire in a couple of construction heaters, and finish...

10-22-2013 04:25 AM

Played out - 5 replies

Well this has been the busiest year ever for me. Between working on my shop and working away from home for three to four weeks at a shot, I am almost played right out. Progress has be slow but things are coming together.Had my insulation and vapor barrier inspected today, and now ready for drywall. They will hopefully start in the next few days....

08-28-2013 12:55 AM

Wiring rough in. - 3 replies

Completed my electrical rough in around three weeks ago, the inspector showed up a week ago inspected and passed my job. I am away from home for another three weeks, then I will be back to work in the shop insulating, and installing the 6mil. vapor barrier. I was going to have a contractor do it but when they quoted $6500.00 I decided to do ...

08-04-2013 09:19 PM

Sunday drive - 4 replies

Took my wife and grandson for a drive this morning looking at the area I hunt in. Got lucky and was in the right place at the right time to see three Moose. !https://s3.amazonaws.com/vs-lumberjocks.com/mr0z3qv.jpg!

07-21-2013 02:12 AM

The new shop finished ( outside ) - 11 replies

Finally the building is complete on the outside, now tomorrow I start with the wiring rough in. Not to sure if I will put in a independent circuit for every tool as I priced out 150 meters of 3#8 cable and it was over $700.00. So I think I will have two 220 – 30 amp and two 220 – 20 amp circuits. All other receptacles will be 20 am...

07-17-2013 01:07 AM

Good day - 5 replies

Well another day has gone bye with lots of progress. The mason almost finished. The windows and man doors were installed, and the siding applicator had a good start. The man doors I picked are a commercial grade steel door which is insulated, the thresholds are not yet installed, these doors seem to be a bit more bullet proof, but do require pai...

07-16-2013 02:51 AM

New shop brick's - 7 replies

Well things are zooming along. Today the siding applicator arrived and trimmed around the shop door openings. so the mason could start laying bricks. Then the windows showed up and lastly the concrete finishers showed up and cut the control joints in the slab. Tomorrow the brick work should be all finished.

07-14-2013 01:09 AM

New shop slab finished - 15 replies

Well the concrete guys placed and finished the concrete slab in my shop yesterday. They did an excellent job doing so. They sealed and even polished it, its like a mirror. !https://s3.amazonaws.com/vs-lumberjocks.com/mpwj4b7.jpg!

07-10-2013 02:29 AM

New shop floor - 5 replies

Well the roof is done and now working on the 5” concrete slab. The floor on the old foundation was cut so that the new slab can tie nicely into it. Then the floor drains were installed and set to grade and lastly the new concrete wall was drilled 16” OC for the rebar grid, the tails of the rebar were set into the holes with epox...

07-08-2013 02:54 AM

New shop shingles - 2 replies

Well the boys showed up yesterday and started the roofing, today they showed up again and almost finished, but it got a little warm and they had to shut it down, as the shingles were starting to stick together in the bundles. They are doing a fine job.

07-02-2013 03:32 AM

New shop roof sheeting - 4 replies

Had a good day, got the roof completed and the sheeting done, hopefully shingles in the next few days.

06-30-2013 01:59 AM

Got the trusses up - 3 replies

Well a little more progress today, got the trusses up. Tomorrow the valley kit, gable end ladders and 2×6 facia. On Monday we should have it sheeted and the shingles will go on soon after. I used vaulted trusses in my shop as the extra head room is real nice, as it will be heated by natural gas radiant tube heaters that get moun...

06-28-2013 04:00 AM

New shop trusses - 5 replies

Well the trusses showed up at 3:00PM. today and are hopefully going to get installed tomorrow. I took the advise of fellow LJ’S and installed my receptacle box’s at 53” to the bottom of the box and spaced 4’ apart. Bought 150 meters of 12/2 wire for a start, let’s see how far it goes.

06-26-2013 07:25 AM

Shop wiring - 21 replies

Trying to get a few tips for wiring my shop. I have been thinking of running my 15 amp 14/2 circuits inside the wall and running my heavier circuits in EMT on the outside of the wall. Most of my larger tools are wired for 220, those tools being a table saw, jointer, thickness planer, 1 1/4 production shaper, 17” band saw, 6’ x 108...

06-26-2013 03:46 AM

New shop wall's - 11 replies

Well a two man framing crew showed up at my place at 5:30 AM. They framed, sheeted and braced the wall’s for trusses and were out of my yard by 2:30 PM. That’s pretty impressive if you ask me. Now comes my job of trying to figure out how I will lay out my big power tools, so I can come up with a plan for the wiring.

06-25-2013 04:12 AM

The new shop - 4 replies

Well back on track, the contractor was working at another job for a week. Everyone showed up this morning, installed the styrofoam insulation on the inside of the concrete wall, backfilled compacted and started laying out the wall plates. Tomorrow the walls go up, thursday the roof trusses and hopefully within the next week the roof ...

06-16-2013 10:58 PM

The new shop update - 7 replies

Well they excavated for my footings three days ago, I left for a couple of days and was suprised to see the foundation complete when I came home. Things are moving along just great, more updates to come.

06-13-2013 01:46 AM

The new shop - 11 replies

Today my contractor started digging the excavation for the footings of my new woodworking shop. The new addition will be added onto my old garage giving me a total area of 2100 square feet. I am really excited its been quite a few years on my mind. It should be finished by September. The contractor is doing the foundation, framing, roof syst...

« prev 1 2 3 4 next »
70 topics


DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com