Built in E-center, Yala #3: It is finished!
I haven’t done one of these in a while. The build was a bit excruciating. Took 6 days, about 10-12 hrs. per day. Started on the Thurs. before Thanksgiving. That was an easy day. I just ran around getting all of the materials together and did some initial layout work and rough cut the plywood sides. These were full height and were too awkward to move around, so I used a straight edge and my new PC 8902 router to get the edges of the plywood ready for the face frames. Once the first side piece was done, it was used as a template to run a pattern bit and “joint” the other side pieces. This gave me good joining edges and all of the pieces were exactly the same, which was key...













