Kitchen Cabinets #2: They call it labor day for a reason....

  • Advertise with us
Blog entry by Kerry Drake posted 09-06-2010 10:14 PM 989 reads 0 times favorited 1 comment Add to Favorites Watch
« Part 1: It's time for a cabinet meeting! Part 2 of Kitchen Cabinets series no next part

I finished the kitchen cabinets on schedule and my brother and sister-in-law came up this weekend and attacked the project with gusto…

First the sheet rock came down, and then most of the wall studs came out.

Then the carpet and the kitchen floor had to be cut back to the subfloor level so cabinets could sit down where they needed to be.

Once the final dimensions were figured out, the end post to support the overhead beam went in place (the beam was pocket screwed into the ceiling joists).

At the end of the first day, the beam was all done, and the cabinets were sitting in place.

At the end of the second day the cabinets were permanently set (the were screwed together and pocked screwed into the floor), and the temporary counter top was installed.

And finally around 1:00pm today (day three) the three massive drawers were installed (they were built on day 2), and the sliding trash bin was also installed.

Everybody is now tired, including Reba the Wonder Dog, and Grace the cat.

-- Kerry Drake, Loudon NH,

1 comment so far

View sras's profile


4362 posts in 2546 days

#1 posted 09-07-2010 12:27 AM

Looks like a nice improvement! I look forward to seeeing the next steps…

-- Steve - Impatience is Expensive

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics