| This blog is written by thedude50 | 28 entries so far |
-
setting up the new shop #20: The biggest problem I have is the shop is running but was never finished
I have 5 unfinished projects in the shop today and I will have to finish these before I can get b...
-
setting up the new shop #19: The Shed is now 99 % done it is water tight
Well guys a long time coming due to finances and then trouble finding a good roofer that was will...
-
21st Century Workbenches Project #7: The First dry fit this will give you an Idea of how big these benches really are.
Well my Friends I have been at if for some time now and felt it was time to get busy I worked on ...
-
21st Century Workbenches Project #6: Milling the legs
Today I spent the day doing the last glue up of the tops and they are either done or in clamps dr...
-
Lunch Box Planer Station #1: The Planning Stage
As most of you who follow my blogs know I am in the middle of a big assed build. I am making two ...
-
21st Century Workbenches Project #5: the first top is done Yea I am Happy
Well guys and Gals the first top is now done and it is on to the second one . The Glue Ups we...
-
21st Century Workbenches Project #4: A small change in wood and a huge savings in money and we are now off and running the build Begins
Well we were left scratching our hears and the word got out on LJ that I needed a bunch Of Maple ...
-
21st Century Workbenches Project #3: Still waiting for the wood and a other option
well the wood was ordered and delivered and rejected buy my wood dealer. so we wait again for the...
-
setting up the new shop #18: Moved in and up and going but not finished
To all my friend who have inspired me and helped me when the evil winds of change blew down my sh...
-
setting up the new shop #17: cleaning out the shop and moving things to the new shed
Well my friends the last week has been filled with moving things from the shop to the new shed th...
-
21st Century Workbenches Project #2: the wood buying process is ready for step two ordering the wood.
Ok we have the calculations and a small bit of input from others here and we are grateful to thos...
-
21st Century Workbenches Project #1: The Planning Phase What do I like and what else would a serious woodworker need in a bench
The Plan was to build myself a workbench and then it was 2 benches as my uncle decided he needed ...
-
setting up the new shop #16: the shed is water tight and is ready for shingles just in time for our first rain
the siding is done the roof is sheeted and the shed is closed in. i have to make the door and put...
-
setting up the new shop #15: on with the show
the loft is made and the final bit of siding needs to get done the gable ends need the top on th...
-
setting up the new shop #14: RAISE THE ROOF THE RESTORATION OF THE SHED HELP FROM LJ BUDDY
I was tieing all the huricane ties to the studs for an hour today and then . waited for the help ...
-
setting up the new shop #13: Back at it and again we have a structure The Shed Rebuilt after the Storm
Well after several days of pulling and cutting off nails,The Shed started being rebuilt on Sunday...
-
setting up the new shop #12: the clean up is well under way
Well My Friends It took about 4 hours of hard work today to get the studs picked up and the botto...
-
setting up the new shop #11: cleaning up the remains and starting over
Ok well i just had to do major keyboard surgery but it is working better now. Tomorrow we will st...
-
setting up the new shop #10: Major setback AS SHED COLAPSES IN FREAK WINDSTORM
Ok well at 2am today we were hit by a major freak windstorm with some gusts as high as 90miles an...
-
setting up the new shop #9: more time on the shed
this entry is for yesterday the day before Thanks Giving I spent a few hours nailing up th...
-
setting up the new shop #8: the shed goues up
the past few days we put the foundation down built the sub floor and sheeted the floor then we fr...
-
setting up the new shop #7: oops i forgot storage
as always i forget something in my projects. this project is setting up a working full-time furni...
-
setting up the new shop #6: sound abound and shelves and a pair of clamp racks
Ok the last 2 days were filled with good intention.s i had a couple of planes to set up and a few...
-
setting up the new shop #5: at a dead stop
i have felt bad all weekend and didn’t get my shop cleaned up so its in the same messy cond...
-
setting up the new shop #4: along with the shop i am moving my office
Today all day i moved things out of my extra room that i used this summer for tool testing due to...
-
setting up the new shop #3: not going as fast as i would like.
We worked here for two days, i changed the places for several items we dismantled the router tabl...
-
setting up the new shop #2: big day tomorrow
my son just got laid off he was doing very well in his new job it looks like the company is on th...
-
setting up the new shop #1: clean out and arrange
Yes the day was filled with moving as many items as i can out of the way to set the new shop up. ...