LumberJocks

Reply by sandhill

  • Advertise with us

Posted on Fishing Electric Wiring

View sandhill's profile

sandhill

2122 posts in 2575 days


#1 posted 03-29-2009 12:59 AM

You can not fill more than 80% of the conduit by code so my advice to you is get a 125 AMP sub panel (lug) with a 100 AMP main in the master panel and run #2 / 3 wire with ground (use UF) and also a 10 foot ground bar outside near the sub panel and no, its not over kill for a shop that has a number of 220 VAC machines as well as high current draw on the 110 equipment. Its cheaper to do it this way now because the load center the wire and breaker is not that much more then what you are buying now for the upgrade. Also check your code they may require you to use metal pipe for inside a shop. 6 gauge would only handle around 45-50 amps safely on a fun of 80 feet. Your UF rated wire which can be buried under ground should never be run in conduit due to heat build up.
My .02 for what its worth

-- Bob Egbert AKA Sandhill http://www.sandhillwoodworks.com/


DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com

Latest Projects | Latest Blog Entries | Latest Forum Topics

GardenTenders.com :: gardening showcase