LumberJocks

Reply by darthford

  • Advertise with us

Posted on Grizzly G0703 Cyclone DC assembly thread

View darthford's profile

darthford

532 posts in 677 days


#1 posted 03-23-2013 09:27 AM

Steps 4 to 9 – I followed the instructions laying the machine on its side on some rubber floor mats to attach the stand. I lifted it upright solo without too much trouble, I chocked the wheels with a folded floor mat.

I attached the handle to the opposite side near the cyclone vs the filter side as shown in the instructions. Both sides have threaded inserts, I felt the handle provided added support to the cyclone side since the base on that side is open plus I wanted the handle under where the bulk of the weight is. It handles reasonably stable given how top heavy it is. If its annoying to move once the barrel us under there I’ll move the handle.

Easy build thus far.


DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com

Latest Projects | Latest Blog Entries | Latest Forum Topics

GardenTenders.com :: gardening showcase