Starting Upper Cut Woodworks #14: Thomas Walnut Dresser - Major Construction is Done!

  • Advertise with us
Blog entry by Matt (Upper Cut) posted 04-20-2010 09:25 AM 848 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 13: Thomas Walnut Dresser - Major Updates Part 14 of Starting Upper Cut Woodworks series Part 15: Thomas Walnut Dresser: Dang those drawers look good! »

Well I’m behind on this project and I’m working my butt off. The case is done, trimmed out, and sanded. The drawer boxes are built and installed. Getting the position just right for inset drawers and metal drawer slides, well, sucks. I am hoping to deliver this Sunday afternoon. I work my regular job 8-5, come home and get some time with the family, them I’m in the shop 8pm-midnight.

There are a lot of new blog entries about this project and woodworking over on my site Upper Cut Woodworks including pictures, so feel free to check it out. There are six new blog posts in April.

-Matt Gradwohl
Upper Cut Woodworks

-- Matt Gradwohl, Upper Cut Woodworks,

0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics