<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>majeagle1's Blog at LumberJocks.com</title>
    <link>http://lumberjocks.com/majeagle1/blog</link>
    <pubDate>Sun, 05 Apr 2009 04:42:24 GMT</pubDate>
    <description></description>
    <item>
      <title>Closure suggestions?</title>
      <link>http://lumberjocks.com/majeagle1/blog/8199</link>
      <description>
        <![CDATA[<p>I am making a small box for a very special friend to put some of the ashes from her recenltly deceased husband. She really likes the keepsake box that i am posting a picture of here:</p>


	<p><img src="http://farm4.static.flickr.com/3593/3413822782_f2ba56cce8.jpg?v=0" alt="" /><br /><img src="http://farm4.static.flickr.com/3397/3413822804_3f8e05bb36.jpg?v=0" alt="" /></p>


	<p>I want to make the top so it is somewhat secure ( not locked ) but because it is such a small box (7&#215;5 x 3)<br />I would prefer not to put a bunch of hardware on it. I thought about a couple of small button magnets mortised into the inside edge of the box to hold the top shut and it would put a &#8220;fair&#8221; resistance on the top from opening. I also thought about not having the top open and then create a bottom that would need to screw on. I am leaning towards the magnets but am looking for suggestons and opinions on hardware!!!!</p>


	<p>Thanks everyone&#8230;..........</p>]]>
      </description>
      <pubDate>Sun, 05 Apr 2009 04:42:24 GMT</pubDate>
      <guid>http://lumberjocks.com/majeagle1/blog/8199</guid>
      <author>majeagle1</author>
      <dc:creator>majeagle1</dc:creator>
    </item>
    <item>
      <title>My Workshop and office project</title>
      <link>http://lumberjocks.com/majeagle1/blog/8110</link>
      <description>
        <![CDATA[<p>Well, this is my <strong>first</strong> “blog” so I will give it a go. I was just going to post some pictures of my workshop as it is now, but then I ran into the pictures of entire process so I thought it might be interesting. The workshop is 20&#215;30 with a 10&#215;20 office space inside  as well.</p>


	<p>The ground had to be prepared and then foundation and then I had “<em>Tuff Shed</em>” bring in my “workshop kit”. ( I provided them with full scale drawings and plans that I did on Auto cad ) They had the building up in 2 days, really nice!</p>


	<p><img src="http://farm4.static.flickr.com/3649/3394342574_b1cdc42cc9.jpg?v=0" alt="" /><br /><em><strong>Site Selection</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3420/3393531313_31992f28f2.jpg?v=0" alt="" /><br /><em><strong>Breaking Ground</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3418/3393531343_d1084c1b82.jpg?v=0" alt="" /><br /><em><strong>Laying the foundation</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3443/3393531397_ba97787bb2.jpg?v=0" alt="" /><br /><em><strong>Foundation form with fill and re-bar</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3450/3394342736_d4f6e6aedb.jpg?v=0" alt="" /><br /><em><strong>Foundation poured and being finished</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3616/3394342806_e29993491f.jpg?v=0" alt="" /><br /><em><strong>Foundation dried &#8230;........ and &#8220;Here comes the workshop&#8221;!</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3599/3393531527_4aa709eeba.jpg?v=0" alt="" /><br /><em><strong>First wall going up&#8230;......... This day was exciting !</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3560/3394342874_7c478f90df.jpg?v=0" alt="" /><br /><em><strong>End of first day, framing and outside up and most of the roof completed</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3425/3393531605_87f7cdcd6f.jpg?v=0" alt="" /><br /><em><strong>Start of the second day &#8211; install doors, windows, complete roof and punch list.</strong></em></p>


	<p>Then I had the electrician put in 1 &#8211; 220 circuit and 8 &#8211; 110 circuits. I installed the insulation and then had a sheet rock guy put in the sheet rock and then mud &#38; tape. ( I found out the hard way that there is an “art” to mud and taping!!!!! I’ll leave that to the artists! I did the painting and the carpet and floors and the furniture installation</p>


	<p><img src="http://farm4.static.flickr.com/3553/3394342976_5c52b70719.jpg?v=0" alt="" /><br /><em><strong>Now for the inside &#8211; Insullation completed and ready for sheet rock</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3470/3393531687_97f42ed74d.jpg?v=0" alt="" /><br /><em><strong>Sheetrock completed and ready for paint</strong></em></p>


	<p>Once that was complete, then I installed a deck and stairs on and finally it was done. This all took place the middle of 2005. I have rearranged my workshop only 2 times since then&#8230;.....<br />Now&#8230;........... hindsight being what it is&#8230;........ I now wish I would have doubled the size of my workshop, but, that also would have almost doubled the $$$$$$$$$$$$$$$. Oh well, it works for now and I am enjoying it immensely! Who knows, someday I may expand out over the deck or into my office space.   Enjoy your visit to my workshop adventure !.</p>


	<p><img src="http://farm4.static.flickr.com/3451/3393531735_6e85b34634.jpg?v=0" alt="" /><br /><em><strong>It&#8217;s done !!!!!!!</strong></em></p>


	<p>Now for the actual working inside of my workshop and office</p>


	<p><img src="http://farm4.static.flickr.com/3575/3394343074_36afc0e63b.jpg?v=0" alt="" /><br /><em><strong>Router table, Drum sander, Belt/disc Sander, Dust collection</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3605/3393531785_40c232348c.jpg?v=0" alt="" /><br /><em><strong>Table Saw, Miter Saw, Band Saw&#8230;.....Oh yeh, and &#8220;WOOD&#8221;</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3609/3394343122_5050e93235.jpg?v=0" alt="" /><br /><em><strong>Hand Tools and parts storage, workbench and Drill Press</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3466/3393531841_3bdd3babd7.jpg?v=0" alt="" /><br /><em><strong>Storage for finish, cleanup, misc tools and jigs and entrance to Office</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3417/3393531869_4962234524.jpg?v=0" alt="" /><br /><em><strong>Office central, research, design, and &#8230;.... oh yeh, &#8220;HOURS on LJ&#8217;s&#8221;</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3642/3393531891_aff13440b8.jpg?v=0" alt="" /><br /><em><strong>Storage for wood books, box hardware and some of  my Racing pics on the wall.</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3597/3393531939_5eea764bde.jpg?v=0" alt="" /><br /><em><strong>More storage for completed boxes and packing material</strong></em></p>


	<p><img src="http://farm4.static.flickr.com/3606/3394343218_131889a337.jpg?v=0" alt="" /><br /><em><strong>Stained glass area and where I wax and photograph my boxes</strong></em></p>


	<p>Well, that&#8217;s the end of the tour, sorry it was so long but I hope you enjoyed it.<br />Thanks for taking the time to explore my little corner of the world !</p>


	<p>Gene</p>]]>
      </description>
      <pubDate>Sun, 29 Mar 2009 04:59:44 GMT</pubDate>
      <guid>http://lumberjocks.com/majeagle1/blog/8110</guid>
      <author>majeagle1</author>
      <dc:creator>majeagle1</dc:creator>
    </item>
  </channel>
</rss>
