lizardhead's Blog

  • Advertise with us
This blog is written by lizardhead | 12 entries so far

Latest Entry

20 Mule Team Borax Wagon #5: The Box

01-25-2018 06:41 AM by lizardhead | 3 comments »

Starting the Box, with the frame rails and deck All sanded up and ready for the sides Putting on the side rails. These rails will support other parts as the project proceeds Adding side planks up the rails Box temporarily on the chassis to align the Brake linkage Platform for the water barrels are mounted on beams that extend under the box to the other side. Then iron rods are mounted for extra support Here I have added iron rods to support the rear of the box A rub rail will prevent the Brake lever from digging into the box

Read this entry »

Older Entries

View all 12 entries »

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics