The last post discussed the installation system of the panels. I have been asked how the door panels were fabricated. All three door openings were built using new frames that housed original panels. There was one original main panel assembly that the main frame was in pieces. It had been a 6 panel assembly that allowed me to use the original panels in the 3 door frame panels.
Below is a drawing of one of the door frame panel assemblys. 
Here is a plan view of the same door panel assembly. 
The door jambs were sized to fit the existing office jambs exactly – - the existing office doors were removed from the original jambs, – - skinned with white oak style and rail assemblys,- – - rehung on the new door panel assembly, – - – and door stop that was wide enough to cover the original hinge routing and finished to match the office hallway was installed.
The main panels in the room were separated vertically by a space that was covered by several column assemblys. There was a total of 12 columns that were all different widths, heights, and arrived in pieces. After figuring out what piece went to which column, all were plotted on the computer -
The gap between the main panels also had a depth of 1 1/2”, so it was possible to pre-assemble the columns to a 3/4” X 3” strip of white oak. Below are some shots of the column assembly.

Note the new wood at the top of the lower column panels. These were spacers that brought all of the columns to a uniform height. They would be covered by the chair rail. I assume that they originally varied in height to fit a rough wood or stone floor.
Below are some photos of the panels in process.
Here are CAD views of all four walls
West wall – - -
North wall – - – this is where the fireplace was originally, – - Now a couch.
South wall – - – Below the window is a grate that hides a heat radiator.
The client wanted the finish to be as minimal as possible. To bring the new wood surface to a state that matched the old wood, it was lightly hand scraped and moderately wire brushed. The wire brushing wore down the soft part of the grain and made it look like green wood that is smoothed and allowed to dry. I used 5” wire brush wheels spun by a drill. [ we wore out 4 wheels and one drill. :) ] In finish, all of the original finish was cleaned, the new wood colored to match, and everything coated with shellac.
It took our shop about 1500 hours from start to job-site finish touch-up. I believe that it was bid at 1586 hrs.
Here are some shots after install, but before touch up. The flash on the camera makes the flat parts of the wood appear lighter in color than the carvings, but I am told that they really match better than that.
I have not seen them in person.
And a couple of shots after the client had moved in.
If I find that the client had some professional photos taken, I will post them.
Marshall
-- Marshall _ Wichita, Ks _ "Growing Old is Mandatory - - Growing Up Is Optional" :)




































9 comments so far
GaryK
home | projects | blog
8411 posts in 439 days
posted 175 days ago
That is nice. I am speechless.
-- Gary, East TX -- The longest journey begins with a single step.
Scott Bryan
home | projects | blog
8577 posts in 273 days
posted 175 days ago
Wow. I have followed this all along and enjoyed it immensely. To tell the truth I could not get anything done in that office. There is simply too much wood to look at. I would find myself staring at the wood and moldings.
Marshall, thanks for the entire post. I know it was long and took a great deal of time and effort but I, for one, really appreciated seeing the project.
-- With God's help all things are possible- even woodworking. Woodworking is not just a hobby, it is an (expletive deleted) expensive hobby.
ND2ELK
home | projects | blog
2270 posts in 225 days
posted 174 days ago
What a beautiful master piece to be brought back for all to enjoy. Thank you for posting.
Tom
-- Mc Bridge Cabinets, Iowa
Tony Z
home | projects | blog
120 posts in 241 days
posted 174 days ago
Awesome post! Nice work on it.
-- Tony, Ohio
Bill
home | projects | blog
2512 posts in 612 days
posted 174 days ago
Such beautiful work. What a chore, but also a treasure for someone to enjoy for many years. Well done.
-- Bill, Turlock California, http://www.brookswoodworks.com
Dadoo
home | projects | blog
1511 posts in 441 days
posted 174 days ago
That was a very cool blog series. Thanx Marshall. Do you know off hand of how much your client paid for these at the auction?
-- Bob Vila would be so proud of you!
woodwkr
home | projects | blog
64 posts in 218 days
posted 174 days ago
Dadoo,
>Do you know off hand of how much your client paid for these at the auction?<
I believe it was somewhere around 35 – 40 grand.
-- Marshall _ Wichita, Ks _ "Growing Old is Mandatory - - Growing Up Is Optional" :)
Dadoo
home | projects | blog
1511 posts in 441 days
posted 173 days ago
What kind of origional pieces do you have left over that some LumberJock could turn into a box?
And hey! Thanx for the replies!
-- Bob Vila would be so proud of you!
woodwkr
home | projects | blog
64 posts in 218 days
posted 173 days ago
Dadoo,
>What kind of original pieces do you have left over <
Every piece of original wood that was not included in the room was was loaded up and stored in the clients climate controlled cave somewhere in Missouri. There really wasn’t that much left over.