New shop under construction #6: Finally...somewhat operational
The shop is now somewhat operational. I moved all of the power tools in. I’ve finally finished the baseboards and window casing. The baseboards are 1×6 pine with a chamfer on the top edge and the casings are 1×4 pine. I pre-finished the baseboards with poly but I’ll finish the casing in place because I also have to do the windows. An HVL system sure would have been handy there! I made the casing design myself but modeled it after traditional craftsman style casing. The next step will be to sand the stairs and put a few coats of poly on them. Then I’ll start on the lumber rack and wall-mounted work surfaces. I’ve literally been spending every waking minute...