Building a New Wood Shop #4: Concrete Forms Removed
The cement contractors came back on Monday as promised & removed the forms. The concrete looks great. Notice that the “J” bolts in the top of the wall are installed toward the outside of the side & rear walls where the wall will be covered in vinyl siding. The “J” bolts in the front wall are installed toward the inside of the front wall. This allows me to have a ledge to lay the bricks on. I’ll be bringing in some dirt to level out & to keep the drainage right around the shop. This photo shows the “cut-out” for the double 36” doors. The doors will open outward to allow for more room in the shop. There will be ...