Project Information
When we first moved into the house in 99 My wife and I saw many face lifts needed for a 1970 era kitchen. It was lifted so far that it's now a TV room, and we built a 16×16 extension out the back door. I hired a contractor to build the shell, and my wife and I did everything else from plumbing to electrical, Drywall to custom built cabinets and the flooring. Design changes occurred frequently, but I said as long as they happen "before" I install them that was cool… I'm sure glad she's into that knotty pine, we'd still be waitin for the money to finish the cabinets…