The horizontal framing was done with 2×4s and the vertical frames were made with 2×3s. everything was glued and screwed into the framing ribs of the boat. there will be a walkway around the outside of the pilot house and the casting deck is raising up 1/2 inch each frame brace going forward so all water will run back.

next the house was skinned with 1/2 inch plywood. the top has a 1” taper from center to sides.



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com