Desk rebuild #5: Drawer construction

  • Advertise with us
Blog entry by Ben posted 09-14-2009 06:33 AM 2667 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 4: Set backs Part 5 of Desk rebuild series Part 6: Finish Applied »

So I overcame the router issue with a new router. I bought a Triton 2 1/4 HP model. It seems to work OK so far, although all of the accessories are different than the Porter Cable versions, so I am slowly building up what I have for it. Some of the attachments are a bit awkward—the plate to support bushings didn’t line up quite right with the bottom of the router, and the hose connection requires a threaded 1 1/2 hose. Fortunately, I could work around both these issues.

On to the desk, I am ready to put the first coat of finish on tomorrow! The last step was drawer construction. The biggest challenge with these was dealing with the curved front. I ended up building a square drawer, and then using the band saw to cut a curve in the front piece once all the joinery was complete. I veneered a strip of mahogany on the front, from an adjacent piece of veneer from the front. This gives the front a continuous look.

0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics