LumberJocks

Woodworking blog entries tagged with 'parallel'

  • Advertise with us
View grfrazee's profile

SYP Spilt-Top Roubo Workbench #2: Finished Leg Vise

546 days ago by grfrazee | 8 comments »

I finally got some shop time this weekend and had a chance to complete my leg vise. After my last building session, I had left it basically functional, but lacking a couple bells and whistles to make it really nice. The first addition was a guide wheel on the underside of the parallel guide. I bought another plastic wheel from Woodcraft and mounted it below the guide. It looks like it could become an ankle biter, but I haven’t run into any problems yet. It’s only pock...

Read this entry »


View NBeener's profile

1956 DeWalt MBF 9" Radial Arm Saw #7: (Less) Dust in the Wind

1238 days ago by NBeener | 37 comments »

How does a dog get the LAST bit of water out of his bowl ? With a half-lap :-) Spent too much time figuring out how to get Hurricane Walter to spew less dust, or—at least—how I could capture the dust he spews. Shroud seemed like the way to go. So …. with leftover plywood from the construction of the ol’ ChupaCaja, I made me a dust collection box. ID is about 8” wide x 8” deep x 8” tall. The joinery is (IS it called this ?) half-lap (...

Read this entry »


View PurpLev's profile

MDB #4: The Age of the Machines - Final milling and profiling

1456 days ago by PurpLev | 14 comments »

Disclaimer: This blog follows my Magen David Board that is already finished and posted here Once everything was glued up into a single slab, it was time to plane it flat and parallel. one of the strips I jointed happen (don’t ask me how…lol) to be jointed off square, throwing the last 4-5 strips in the glueup off flat (mostly flat). I was tired at this point, and just figured I’m not going to rejoint it, but will pay the price and plane it all down at the cost of having a...

Read this entry »


View PurpLev's profile

Bowling Alley Workbench #14: Chop Chop Laddie. (the leg vise)

1812 days ago by PurpLev | 13 comments »

This project is a fine example of the 80/20 concept. it takes 20% of the project time to complete 80% of it, and then, 80% of the project time to finish the last 20% of the project. As it gets to the details, things take longer to think through, plan out, cut…mill…glue… and finesse. this time it’s the leg vise Chop, and although not completely finished (still need to trim, round off, and apply BLO), it’s construction is done. I was originally planning to us...

Read this entry »


View PurpLev's profile

Bowling Alley Workbench #7: Moving forward at 0mph

1842 days ago by PurpLev | 8 comments »

It’s interesting how it feels like you’re standing still when you’re working on already dry-fit parts for additional features. After all – at the end of the day when you look at all the parts – they seem to look just the way they did in the morning. bummer. but even though things don’t seem that way somethings. Progress IS progress, and is one step closer to the finish line. Today I implemented the hardware for the leg vise in the right leg (I’m...

Read this entry »



DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com

Latest Projects | Latest Blog Entries | Latest Forum Topics

GardenTenders.com :: gardening showcase