Bowling Alley Workbench #5: Rain Rain go Away - Rail Rail Done Today
July, and it was pouring rain here in Boston, MA. for the past week. go figure. (although today it cleared out which is really nice). but enough about the weather (as if this will stop us). After completing the basic construction for the leg ends last installment. It was now the time to connect those with rails. The rails are 45” long with 2 1/2” tenon sticking on each side (to a total length of 50” – do the math). They are made of 2 2×4 that were jointed/plane...


















