LumberJocks

Shop Upgrades #8: Wall Track

  • Advertise with us
Blog entry by bkseitz posted 01-21-2016 10:01 PM 647 reads 0 times favorited 1 comment Add to Favorites Watch
« Part 7: Air Quality: Dust Collection and Air Filtration Part 8 of Shop Upgrades series Part 9: Shop Remodel -continued reorganinzation »

Added more wall track during a lunch break today. Focused mainly on getting automotive section completed so I can separate automotive from woodworking tools.

Now I have an area dedicated to sharpening and maintaining tools

Still to finish is the rough cut, drill press and measurement workstation areas

This weekend is back to electrical work: troubleshoot lighting bank, install Outside Motion Sensor LED & Overhead LED lights and Heat lamps for the Goat Barn. Then if lucky repair Workshop Roof Leak and back to Dust Collection Build :-)

-- bkseitz, Washington "if everything is going well, you've obviously overlooked something"



1 comment so far

View Reaperwoodworks's profile

Reaperwoodworks

94 posts in 403 days


#1 posted 01-22-2016 05:40 AM

It’s always a work in progress. Looks pretty dang organized to me. Our shops are very similar. I’m in a steel building also. Looks like your concrete guy did a much better job than mine did. Every time something goes wrong around here, my wife and I blame the concrete guy, his fault or not.

-- Website: www.reaperwoodworks.com, Youtube: https://www.youtube.com/channel/UC_ognomZyK6V0VwdokBcixw

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com