LumberJocks

Dungeon Remodel, the drill til #5: About done cleaning up

  • Advertise with us
Blog entry by bandit571 posted 04-16-2018 05:13 AM 435 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 4: Day 3...half n half... Part 5 of Dungeon Remodel, the drill til series no next part

And took a bit of time for a little Rust Hunting.

Corner is clean and dry…

Stashed the old bandsaw back in the hole…hopefully things won’t get tossed back there so much….I intend to park the router table in beside it..

Once I can get it cleaned off. May add a shelf or two under the old lathe bench..

And even clean up the top of it….

This is the new Shop Trashcan.. Has wheels to make it easier to haul upstairs….before it gets too full..

One area needed dragged out..

Was finding more tools in them shavings..

This I found..I missed a spokeshave and a Veritas honing guide..both wound up in the firepit…was able to save the spokeshave…guide was DOA. Anyway,, floor got swept..

Just waiting on a dry, non-windy day to burn the last of the shavings.

When I came back from a garage sale, found these stick up from the ashes in the firepit…I cleaned the spokeshave up, back to bare metal. Sharpened the iron, and tuned the thing up..

Didn’t have any black spray paint in the shop. I had a tube of Gun Blue paste, though. Wipe on, let dry, wipe off the excess..

Sole did need a little work….I even found the logo on the iron..

Have a bit of rust hunt finds to clean up, and put away…may stop the shop clean up, for now….and make a bit of saw dust? Will update if anything else happens, cleaning wise.

Thanks for following along…

-- A Planer? I'M the planer, this is what I use



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com