| This blog is written by TheDane | 14 entries so far |
-
Segmented Stave Bowl #4: Day Four - At Last!
The glued up blank and bottom sat in the clamp overnight and we are ready to turn. I used my c...
-
Segmented Stave Bowl #3: Day Three - Finally Turning
The blank dried overnight, so it is time to pull the tape off, install the Cole Jaws on my chuck,...
-
Segmented Stave Bowl #2: Day Two
With the glue dry on the two halves of the bowl, I needed to make sure they would mate up properl...
-
Segmented Stave Bowl #1: Day One
Technically, what I am working on here is a ‘Stave Bowl’ ... a bowl comprised of vert...
-
New Shop Project #6: New Shop Finished (for now)!
I’m finally at the point where I can call the new shop finished … at least for now. I...
-
New Shop Project #5: Move-in Day!
Got the cabinets installed today and moved the tools in from storage … nothing is put away ...
-
New Shop Project #4: Shop Cabinets Arrived Today
Cabinets arrived today … these came from RedLine Garage Gear of Green Bay. Looks like pr...
-
New Shop Project #3: Moving along ... slowly!
Wrapped up the carpenter work this week … installed service doors into the main part of the...
-
New Shop Project #2: Let There Be Light!
Once the walls were up, the new shop area (with only a single 100-watt light bulb in the ceiling)...
-
New Shop Project #1: Week One - Progress!
(Initial blog entry: http://lumberjocks.com/TheDane/blog/29725 ) Some real progress this week ...
-
New Shop Project
I’m starting an exciting new phase of my woodworking experience. My wife and I retired i...
-
Drill Press Dust Collector Fixture #2: Follow-up
Here it is a month later, and this little fixture is proving to be a better idea all of the time....
-
My Menards Shopping Experience
Shopping experiences at big box stores are not always bad. Below is the text of a letter I am sen...
-
Drill Press Dust Collector Fixture #1: Drill Press Dust Collector Fixture
Several months ago, I ordered the Peachtree Drill Press Dust Collector. When it arrived, I was...













