LumberJocks

Final Project Progress

  • Advertise with us
Blog series by Steve Magdinec updated 05-28-2014 02:52 PM 13 parts 14690 reads 13 comments total

Part 1: Final Project Proposal 1/30/14

01-30-2014 03:12 PM by Steve Magdinec | 2 comments »

At this point in my creation of a luxurious gun rack, I have accomplished great work. I completed my planning and have cut down and planed the side pieces of my gun rack to the correct measurements. I then used carbon paper to trace my outline onto my cut wood. This is where I am currently at. I have had no problems so far, and hope to be cutting and shaping these two side pieces by next week.

Read this entry »


Part 2: Final Project Progress #3 2/20/14

02-21-2014 02:40 AM by Steve Magdinec | 0 comments »

This week in wood shop I have devoted my time in completing my pitching mound. I was thrilled to be able to pitch of it in practice today, as it held up well and did its job. I plan on continuing my work on the gunrack next week. Check out the pictures I posted for the pitching mound.

Read this entry »


Part 3: Final Project Progress #4 2-27-14

02-27-2014 03:56 PM by Steve Magdinec | 1 comment »

Finally after a long 2 weeks of working on the pitching mound, I was finally able to start my final project, the gun rack. I already had my wood carved for cutting, so I went ahead and pre-drilled some holes in order to make my life easier on the band saw. After doing a rough cut on the band saw, I was able to have the edges completely sanded and smooth in 2 days. All went well, but for my second piece I will do a closer cut with the band saw to make sanding easier. I hope to accomplish a lot...

Read this entry »


Part 4: Final Project Progress #4 3/7/14

03-07-2014 02:36 PM by Steve Magdinec | 1 comment »

This week in wood shop I cut out my traced side pieces for the gun rack. I used the band saw to get as close to the trace as possible and then I sanded down the rest. It took 2 days to sand but most importantly I am happy with the results. Today I am gonna work on designing the top cross section ( I will carve deer antlers into it) and I hope to have that completed by the middle of next week.

Read this entry »


Part 5: Gunrack Update 3/13/14

03-13-2014 02:45 PM by Steve Magdinec | 1 comment »

This week, I completed the sketching and carving out of my top piece. I decided to go with carving deer antlers into the center of the piece. I am very pleased at how it looks, and I’m glad I took my time on the bandsaw. Since the antlers made the wood thin, I decided to glue an additional piece to the bottom, with a piece of walnut wedged in the middle. Unfortunately, I was unable to plane the walnut to the correct length because I blew up the planer. I couldn’t express my pity a...

Read this entry »


Part 6: Gunrack Update 3/20/14

03-20-2014 02:30 PM by Steve Magdinec | 1 comment »

This week I did a glue up on my top piece. I added a piece of walnut and got it glued nice and tight. I drilled pocket holes on the side to make drilling into the side pieces a lot easier. I am now ready to work on the bottom shelf which will accompany an ammo box. This will take place next week.

Read this entry »


Part 7: Gunrack Update 3/28/14

03-28-2014 01:35 PM by Steve Magdinec | 2 comments »

This week I did not do much with my gunrack besides sanding and cutting my bottom shelf. Hope to have more progress completed next week with some pictures.

Read this entry »


Part 8: Gunrack 4-4-14

04-04-2014 02:27 PM by Steve Magdinec | 1 comment »

Upon building my luxurious gunrack this week in woodworking, I was able to make my shelves to support the ammo box and I also am about done making my bottom piece. For my bottom piece I decided to go with a glue up using cherry inbetween the oak. I did a rustic old fashioned design. In order to finish I just have to smooth the edges and rout my design. I will post pictures next week and hope to begin the assembly of all my pieces.

Read this entry »


Part 9: Gun rack update 3-11-14

04-11-2014 06:04 PM by Steve Magdinec | 1 comment »

Much dedication and hard work has gotten me to where I am today. Finally after countless weeks of fine tuning, reworking, and cutting and carving wood, I am ready to assemble all of my pieces. I set them together today to see what they look like and all looks good, except for one little glitch. This is that my shelve pieces need planed down about another 1/16 of an inch to sit good in the dados. I will fix this on Monday and have all pieces together early next week.

Read this entry »


Part 10: Gunrack update 4/24/14

04-24-2014 02:41 PM by Steve Magdinec | 1 comment »

This was quite a depressing week in woodshop. After all of my hard work, I was finally ready to assemble my pieces a few days ago, only to find out that I measured some pieces incorrectly. I screwed my shelf pieces in and one was shorter than the other. Along with this, my bottom piece was also too short by almost an inch. Getting over my frustrations, I jumped straight into making new pieces and am actually almost ready to stain and reassemble. By next week I will have my new pieces all toge...

Read this entry »


Part 11: Gunrack Update 5-1-14

05-01-2014 01:23 PM by Steve Magdinec | 0 comments »

After finding out last week that some of my pieces were incorrect lengths, I am finally done making new pieces. I glued in my new shelves, along with my bottom piece, which I think looks better than the previous one. I currently have the whole shibang all clamped together and will begin working on my ammo box today. So far so good!

Read this entry »


Part 12: Gunrack Update 5/23/14

05-23-2014 03:32 PM by Steve Magdinec | 1 comment »

Finally after months of constructing my fine masterpiece, I am finally finished with my gunrack ( besides for installing my hardware). I recently stained my finished piece of art, along with 2 coats of semi- gloss poly. Next week I will install hangers, hinges, and a door stop. I am more than happy with the outcome and can’t wait to display it on my wall. I will post pictures next week.

Read this entry »


Part 13: Gunrack Completion 5-28-14

05-28-2014 02:52 PM by Steve Magdinec | 1 comment »

Yeah! Woooooo! I am finally 100% completed with my gun rack and ready to take it home. I am more than pleased with the outcome and am proud of all the hard work and dedication that I poured into this project. A special thanks to Mr. Santucci for all the help and supplying the wood, I couldn’t have done it without him. Also I’d like to thank Mr. Richard Knox for caring so much about my project and always being there to help when it wasn’t needed. ( he’s also...

Read this entry »



DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.