Crates #1: Aircraft Carrier Steam Catapult Launching Engine Cylinder Cover Shipping Skids.
This covers the construction of 26 shipping skids described in project 80698. Lumber:86 – 4×6s 16 feet long26 – 2×6s 8 feet long234 – 1/2×10 inch galvanized hex head bolts234 – 1/2 inch galvanized nuts468 – 1/2 inch galvanized washers780 – 3 1/2 inch framing nails Tools:Hitachi 12 inch miter sawDeWalt miter saw stand.Black and Decker 1/2 inch “Hole Hog” drill, all metal constructionPorter Cable Framing NailerCampbell Hausfeld 1/2 inch impact gunFraming Square8 – 12 inch Bar clamps Jigs:Miter saw extension support (made on site)Spacing and alignment jig (for one end)Spacing jig for other endStoryboard for marking...