Ok, so here’s the latest, The cones is assembled, as well as the intake pipe and the center pipe. I need to create the container for the bottom, and mount the cyclone, Sand and attach the intake pipe. You can figure out most everything else from the photos, however I will try tom put a description under each one.
Let me know what you think and if you have any suggestions, I am just about out of scrap and pallet wood, so the project is on hold until I can dumpster dive for some more, enjoy.

strips for intake pipe cut and backed with painters tape.

Intake pipe clamped and drying

Top installed and ready to be trimmed with flush router.The back of the cyclone I made higher to mount a motor with a squirrel cage assembly. Currentley I will be using the shop vac until I can find these parts in the dump, or on Craigs list.

Ready for sanding and attachment.
-- Martin ....always count the number of fingers you have before, and after using the saw.

















2 comments so far
DocSavage45
home | projects | blog
2882 posts in 1015 days
#1 posted 458 days ago
Don’t look so hard and the stuff will come to you! I am cleaning and tossing and organizing all that stuff. LOL
-- Cau Haus Designs, Thomas J. Tieffenbacher
stefang
home | projects | blog
9510 posts in 1506 days
#2 posted 458 days ago
Great job on this.
-- Mike, American in Norway
Have your say...