Lee and Shelley's Wet Bar #6: Final Assembly of Base Cabinets

  • Advertise with us
Blog entry by MT_Stringer posted 147 days ago 791 reads 0 times favorited 1 comment Add to Favorites Watch
« Part 5: Drawer and Carcase Construction Part 6 of Lee and Shelley's Wet Bar series Part 7: Installation Day at Last »

Time to put ‘em together.

Each face frame was attached to the carcase with pocket hole screws.

The drawer cabinet is complete and ready for drawer fronts to be attached.

The left side of the sink base cabinet has a 1/4 inch maple skin attached because it is open to view.

Sink base is complete.

Next up, the two end cabinets. Each one has two small drawers and two doors. The left end cabinet was skinned on both sides and it has the short shelf.

Installation is next.

-- Handcrafted by Mike Henderson - Channelview, Texas



1 comment so far

View Roger's profile

Roger

14373 posts in 1436 days


#1 posted 143 days ago

Looking very good

-- Roger from KY. Work/Play/Travel Safe. Kentuk55@bellsouth.net

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com

Latest Projects | Latest Blog Entries | Latest Forum Topics

GardenTenders.com :: gardening showcase