Shop Expansion #5: Almost there!
Its been along haul,,,,,,,,,,but its finally taking shape! The outside of the building was completed 3/5/09. It took from that date until the middle of May for the power company to decide what they wanted to do to get the power to the building. They finally decided to put in a pedastal in the back yard to run the power from. (at a cost of $1350.00). I had a seperate meter put in the shop so I could cut it loose from the house. I got a final on the buiding and the electrical on 6/19/09. Then was my turn to go to work. I worked every evening after work as well as every weekend (still doing so). Got all the wiring finished (about 1000 feet or so). Put up up a couple of walls for an of...