LumberJocks

Big cabinet for the new home #3: Design change, big dado setup, rabbets and an oops.

  • Advertise with us
Blog entry by Lalen posted 05-13-2018 01:55 AM 308 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 2: This thing will be heavy! Part 3 of Big cabinet for the new home series no next part

Design change.

More difficult but I think this one looks much better. Primarily changed up the door design to go inset with an upper and lower cabinet and with more glass panes. Went from 6 to 12 doors. We still haven’t decided on the detail for drawer fronts. Crown molding will be more ornate.

Compare to the original.

I was really concerned about getting the interior dados lined up for the sides and back. I knew it wouldn’t go together well if they weren’t lined up perfectly. Each back was 33” and sides are 18.75. I created this little setup on the floor so I could cut them all together. I tacked a long straight edge across the top of some underlayment.

I then butted the 3 pieces against the straight edge and each other, then tacked a fence for the router to run against while keeping the pieces together.

About 120 liner feet of 3/4×1/4 rabbets and dados create a big mess.

OOPS!

I was cutting rabbets on my last board, turned the corner and started down the side before remembering this board didn’t get a side rabbet. bummer.

In the end, not a hard fix, but I’m happy this is will be a painted project.I just sized and glued in a piece. once dry, I’ll trim it flush and move on.

Next step will be assembling these big carcasses and trying to keep them square!

-- Lalen, Texas. "If it looks straight, it is straight" Jimmy Diresta



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com