LumberJocks

2010 Sawdust Chronicles Build Challenge

  • Advertise with us
Blog series by Shawn Sealer updated 1099 days ago 12 parts 32574 reads 26 comments total

Part 1: iWW Eps 4 My project Sawdust Chronicles Build Challenge

1273 days ago by Shawn Sealer | 1 comment »

Part 1 of a multi-part series on my project for the 2010 Sawdust Chronicles Build Challenge.

Read this entry »


Part 2: iWW Ep5 Sawdust Chronicles Build Challenge Part 2

1260 days ago by Shawn Sealer | 4 comments »

Part 2 of the Sawdust Chronicles Build Challenge. I don’t have a jointer so I have to get an old Stanley No.7 up and running.

Read this entry »


Part 3: iWW Ep6 Sawdust Chronicles Build Challenge Part 3

1246 days ago by Shawn Sealer | 2 comments »

Part 2 of the Sawdust Chronicles Build Challenge. Getting my opened box (no Box) $150.00 planer up and running. rough milling the wood.

Read this entry »



Part 5: Part 5 of my project for the 2010 Sawdust Chronicles Build Challenge.

1196 days ago by Shawn Sealer | 0 comments »

In this episode: Laying out and rough cutting the top. Laying out the aprons as well as scroll sawing the template. Planning the legs to final dimensions.

Read this entry »


Part 6: IWW Eps9 Part 6 of my project for the 2010 Sawdust Chronicles Build Challenge.

1183 days ago by Shawn Sealer | 2 comments »

In this episode: Cutting the Legs to final dimension. Prepping the top for glue up. Gluing up the top. scroll sawing the new template.

Read this entry »


Part 7: IWW Eps 10 Part 7 of my project for the 2010 Sawdust Chronicles Build Challenge.

1169 days ago by Shawn Sealer | 6 comments »

In this episode: Finding a way to flatten the top. Building a large sanding block. Planer Sled Construction and putting a blade on my band saw.

Read this entry »


Part 8: iWW Eps 11 My Project for the Sawdust Chronicles Build Challenge Part 8

1155 days ago by Shawn Sealer | 4 comments »

In this episode:Planning and gluing up the inlay. Finishing the long sanding block.

Read this entry »


Part 9: IWW Eps 12 Part 9 of my project for the 2010 Sawdust Chronicles Build Challenge.

1140 days ago by Shawn Sealer | 3 comments »

In this episode:Laying out the legs. Cutting the slots for the Inlay. Drill out the mortises and clean out with a chisel

Read this entry »


Part 10: IWW Eps 13 Part 10 of my project for the 2010 Sawdust Chronicles Build Challenge.

1127 days ago by Shawn Sealer | 0 comments »

In this episode:Laying out the legs. Cutting for the inlay. Cutting the mortises.

Read this entry »


Part 11: IWW Eps 14 Part 11 of my project for the 2010 Sawdust Chronicles Build Challenge.

1112 days ago by Shawn Sealer | 2 comments »

In this episode:Setting the inlay. Rounding over the leg. Router plate. Carving the aprons.

Read this entry »


Part 12: Eps 15 Part 12 of my project for the 2010 Sawdust Chronicles Build Challenge.

1099 days ago by Shawn Sealer | 2 comments »

In this episode:Finishing up. Routing the aprons. Carving the apron parts. Assembling the table, and finishing

Read this entry »



DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com

Latest Projects | Latest Blog Entries | Latest Forum Topics

GardenTenders.com :: gardening showcase