LumberJocks

HotRod1's Blog

  • Advertise with us
This blog is written by HotRod1 | 2 entries so far

Latest Entry

New Peterbuilt truck #2: Airbag suspension

02-15-2018 09:19 PM by HotRod1 | 5 comments »

I took a 1/2” dowel and drilled a 3/8” hole about 3/8” deep, then drill a 1/4” hole through. Then to make the bottom, I took a 3/8” dowel and drilled a 1/4” hole through and glue the spring in place. and put a cap on the top of the bag. Here are some pictures of the trailing arm, shackle and axel. Still in the test fit mode as I haven’t made the drive shafts yet. As soon as I get it complete, time to start on the front.

Read this entry »

Older Entries


DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com