Part 1: Bathroom Vanity and linen closet.

08-02-2010 02:31 AM by GregP | 1 comment »

So, I have a bunch of things in the works at the moment and I figured I might as well post some blogs about them. This is a bathroom Vanity and linen closet I started building for my neighbor about two weeks ago. It’s being made out of cherry.......................................................................................................................................................The Vanity .................................................................................

Read this entry »


Part 2: Todays progress, Doors

08-03-2010 05:19 AM by GregP | 2 comments »

Had a couple blow outs while raising the panels but was able to patch them. will sand the joints perfectly flush in the morning.

Read this entry »


Part 3: Progress today

08-04-2010 06:19 AM by GregP | 1 comment »

Today I got the side panels connected to the plywood side, attached the face frame and the back of the linen closet and glued up the doors for the vanity, will router the face frame flush in the morning.

Read this entry »


Part 4: Progress: Drawer Fronts

08-05-2010 05:28 AM by GregP | 3 comments »

Today I flush cut, sanded and chamfered the boxes, I also cut the drawer fronts out. It’s starting to look like something now. Will probably put some aniline dye on tomorrow and maybe make some drawers, There are eight so it will be somewhat tedious. My garage is getting pretty tight now, the pantry will probably be out of there soon though didn’t do a blog on it but will probably post it in completed projects pretty soon, I have to cut some granite and then I can install it. ...

Read this entry »


Part 5: Progress today

08-06-2010 05:35 AM by GregP | 2 comments »

Today I ogee’d the drawer fronts and doors, applied aniline dye to some pieces and finished the kick up on the vanity, it’s going to have motion sensor lights in the bottom. The aniline dye looks funny now but It always looks great once the finish goes on.

Read this entry »


Part 6: Sprayed first coat of finish.

08-10-2010 08:53 AM by GregP | 8 comments »

So today I sprayed the first coat, it’s coming along nicely so far.

Read this entry »


Part 7: started dovetailing the drawers today.

08-12-2010 05:51 AM by GregP | 3 comments »

I completed the finish today and started on the drawers. I plan on assembly tomorrow. Drawers getting started

Read this entry »


Part 8: The drawers are finished.

08-13-2010 04:08 AM by GregP | 5 comments »

Took all day to make the drawers, will assemble tomorrow. The drawers are all soft maple.

Read this entry »


Part 9: Completed and being installed.

08-15-2010 09:27 PM by GregP | 6 comments »

I will also be posting the completed project in the completed projects section however I also wanted to post it here because I’ve posted most of this projects progress here and I feel it needs closure. It has a couple little things left to do to it however since the bathroom it’s going in to is so small this will be it’s completed pictures since I can’t take them in the little bathroom.