LumberJocks

shop re start the new RMR #3: hesitant progress

  • Advertise with us
Blog entry by DsRMR posted 02-26-2017 10:10 AM 518 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 2: a little progress Part 3 of shop re start the new RMR series Part 4: stop water penetration and band saw breakdown »

well a little progress has been made unfortunately i’m hesitant to do too much because i may lose the place with the recent employment termination and lack of resources in new state.
<div>dgiacchino69's new shop album on Photobucket</div>

But anyway i was going to move my 4×8 work bench in as a alt. out-feed table, but instead i added on a 18”x40” removable leaf for now. I did get the base and stationary fence done on my cross cut sled, next is assembling the adjustable miter fence and attaching it. got the knives to the joiner honed and ready to install. not going to start breaking down the band saw yet till i know if i have to move again or not.

New friend and fellow wooder had enough re purposed pine for the 2 front legs i was missing to be able to assemble one of my hi-boy chairs so i will have a model chair to show and hopefully generate some sales from it. those that requested a copy of plans i have not located them but i do have full size MDF templates made and i will sketch up some plans for ya

-- say not I can not but I Can



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com