LumberJocks

Building Dave's Bar Clamp #7: Finishing up

  • Advertise with us
Blog entry by Dave Rutan posted 09-28-2016 12:26 PM 397 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 6: Movable stop Part 7 of Building Dave's Bar Clamp series no next part

[Legebla ankaĆ­ en Esperanto]

[Above] After the movable stop is on the bar, insert a piece of 1/4 in. dowel into the hole at the end of the bar. This keeps the head from sliding off. The dowel can be glued in, but if it is snug, you may want to leave it be. If left removable, the possibility is open to join two clamps together to make a longer one.

[Above] Take the 1 in. x1 in. x 4 in. piece of wood and drill a 3/8 in. hole down the center about 3 in. deep. Using epoxy, glue it to the end of the threaded rod. After that sets up, your clamp is done. I finished mine with boiled linseed oil.

See the finished project page here [link]

-- Ni faru ion el ligno!



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com