Current Project #7: Still Upside Down

  • Advertise with us
Blog entry by Dave Rutan posted 09-09-2014 12:10 AM 934 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 6: Legs! Part 7 of Current Project series Part 8: Time for sanding »

Not a thrilling photo today, but I had to get my feet back under me after the weekend. On Friday afternoon our well developed a problem. I had to call a plumber for this one. As plumber calls go, this one wasn’t that bad, though prepping for his arrival caused me to clean out a storage area of my shop and put that stuff in my shop proper.

So today I worked on the legs. The only thing I need to do to the base at this point is saw some edging to hide the plywood edges and glue it on. The brace that you see going between the legs will be cut in half as it’s too wide. It isn’t glued on. It bolts onto the legs, so that the base stays up while the table top is put on.

The way my legs are attached to the top is very secure. I’m happy. Tomorrow I should start staining the base. Then I get to tackle the table top!

-- Ni faru ion el ligno!

0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics