LumberJocks

Chuck McIntyre's Blog

  • Advertise with us
This blog is written by Chuck McIntyre | 6 entries so far

Latest Entry

Built-In Ironing Board Cabinet #5: Door Finished

09-07-2015 11:46 PM by Chuck McIntyre | 0 comments »

I have spent some time this weekend getting the door finished. I used a Zar stain that Sherwin Williams custom mixed for me to match a sink base I had bought for a bathroom remodel. I then applied three coats of General Finishes satin Arm-R-Seal. Sanded between coats with 400 grit. I pre-drilled the left stile for three hinges as the door is 49-3/4” tall. If everything goes as planned, I should be able to get it installed tomorrow.

Read this entry »

Older Entries


DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com