LumberJocks

BRAY's Blog

  • Advertise with us
This blog is written by BRAY | 3 entries so far

Latest Entry

Kitchen Remodel #1: Phase - I

1626 days ago by BRAY | 4 comments »

Here are some pics of our recent Kitchen remodel in progress. This is the condition of most of our cabinets— they’re toast. Here is a real life saver my wife got me this for Christmas. Look at the poor job the original electrician hid behind the old range hood. I decided to add a plug-in and box for the microwave. I plan to move the fridge, dish washer, sink and window to the right about one foot or so. Plug-in fit like a glove. Bracket installed and ready for the microwave oven. Phase-I nearly complete. All I need to do is run the ductwork and box it in. Sorry about all the mess and clutter. Thank you for viewing.

Read this entry »

Older Entries


DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com

Latest Projects | Latest Blog Entries | Latest Forum Topics

GardenTenders.com :: gardening showcase